Integration

Integration guides for production teams

This page shows a recommended way to connect EvaluatorDPT into a workflow, with clear boundaries, clear ownership, and clear operational expectations.

How to integrate

Place EvaluatorDPT between the decision input and the downstream action so the output can govern behavior.

What to define first

Identify the decision point, the expected labels, and the conditions where the system must defer or escalate.

What to verify

Confirm auth, latency, monitoring, support ownership, and fallback behavior before production rollout.

Recommended integration flow

  1. Submit the decision input payload from a trusted backend.
  2. EvaluatorDPT applies policy-aware decision control and returns the result.
  3. Your application routes the next step based on the returned label and metadata.
  4. Use the Trust Center to align legal and operational expectations.

Implementation checklist

Use this checklist to prepare the integration path, ownership, and production readiness.